0
207
Today, our team installed an anti-parking peg on a paved surface in an urban environment. The process included several main stages to ensure stability, durability and an aesthetically finished look.After precisely marking the location, part of the pavement was removed to form a stable base for installation. The space was cleaned of dust, leaves and..
Showing 1 to 1 of 1 (1 Pages)